NSW
NSW
VIC
1300 36 11 02 Mon - Thur 07:00 - 15:30 Fri 07:00 - 13:00 Unit 1/7 Luso Drive Unanderra, NSW Australia
1300 36 11 02 Mon - Fri 08:00 - 16:00 Victoria, Australia
Ceritified
CEC Accredited
Quality Assured
Installed by us - Not "Subbies"
Number #1
100% Australian Owned
Get A Quote

Grid & Off-Grid Wind

Caption aligned here

Grid & Off-Grid Wind

Wind is regularly used on both a micro and network scale. If you have a suitable location it is potentially a very good solution and also tends to be very sustainable.

What is a HYBRID Installation

A wind turbine installation can be used in both an off-grid and on-grid installation. It could be used to either charge and supply your off-grid/hrbrid or on-grid and sell back/consume.

How much does it cost?

To accurately price an installation we would need to know if you already have a system in place? What your daily loads are? And what your peak load is?. Feel free to fill in a quote form and we can help with designing the perfect system for you.

How long does the process take?

The process of installing such a system is quite quick, even as low as 1-2weeks. However. There is time to be spent doing network applications to ensure suitability to the electrical network. This can sometimes take a few weeks.